|
|
ECO Model
|
The ECO Model Waste Oxidizer is our larger, custom-sized waste disposal system. The ECO model features one or two large Primary Chambers that can accommodate unsorted waste including large bulky items.
It operates in a single batch-per-day fashion. The burn cycle is generally 8 to 12 hours followed by a 6 to 10 hour cooldown. Nominally, including time for loading and ash removal, the process takes place over 24 hours. This model can be outfitted with various options to automate loading and ash-removal. It is available in a range of sizes capable of processing up to 10 tons per day.
 | |
|
|